Fd09 roof top chimney pipe detail fd10 roof top plumbing vent pipe detail fd11 sheet metal pipe enclosure detail.
Duct through roof curb detail.
The copper base flashing extends a maximum of 4 onto the roof.
The curb should be furnished with a wood nailer which provides a minimum of 3 inches of nailing.
Specify prefabricated roof curbs and related products by a roof curb manufacturer not with or by the equipment manufacturer.
Va standard details numbering system relates to specification masterformat 2004.
Pipe chase curb supports as required.
Each detail is available in pdf and autocad dwg formats go to our secure ftp site do not use internet explorer use another browser for the dwg format drawings.
All in one unit needs only one roof opening is leakproof and durable under all weather conditions.
The curb can also be mounted on a roof deck.
1 1 2 inch thick 3 pound density rigid insulation not on tc 5 12 curb available on amazon here.
Factory installed wood nailer.
Electric conductivity water panel controller.
Specify prefab roof curbs for use with all roof penetrations and roof mounted equipment including and not limited to hvac units duct openings pipe penetrations power roof exhauster intake and relief vents flues or job fabricated items.
Gutter brackets are required to be at least one gauge heavier than gutter stock.
Roof curb shipped in pieces for fi eld assembly.
Comes ready to install including.
In this case additional nailing plates must be provided directly below the flanges of the curb to give further support and to minimize vibration.
Electric water heater non circulating piping detail.
Pate pipe curb assembly prevents leaks when pipes go through a conventional or metal roof.
Roof curb thermoplastic cover with sleeves scored for as many as 4 pipes from to 10 o d and watertight boots graduated for standard pipe sizes with adjustable.
Since the details are inherently graphical in nature they are not readable by a screen.
Non canted equipment roof support detail.
Prime g 90 galvanized steel.
Curb should be placed directly on the roof support members.
It extends up at least 9 and is lapped at least 4 by the counterflashing.
Duct thru roof detail.
Roof curb must be installed square.
Fd17 and interior drains or through curb scuppers to drain the roof.
Mixed flow upblast exhaust fan and curb detail.
The horizontal portion is nailed to wood blocking or to a nailable deck.
Pipe curbs available as typetc 1 tc 2 tc 3 and tc 5.
D a 14 2 c b 1 7 8 1 1 2 figure 7 typical flat roof curb notes.
Curb curb rest nailer and gasket only furnished by york.
Use tack welding or other suitable fastening method to secure the roof curb in place.
Multiple pipe penetration thru roof.
Emergency shower eyewash detail.
Base flange attachments for securing to the building structure.
The curb and the equipment should be structurally capable of supporting intended loads and should be so designed that no penetration for drains power lines etc will occur through the roof flashing.
Attach wood nailer to wall or deck with suitable.
Til feedback we welcome your suggestions at til va gov.